| Due to the rapid hardening of Ciment Fondu®, the heat released in the first few hours after setting is sufficient to enable concreting in sub-zero conditions, down to -10°C. Concreting in freezing conditions requires specific caution, more information is given in the Ciment Fondu® brochure. |
Industry
|
- Floor repairs in cold stores
- Tunnel Freezers
|
Civil engineering
|
- Works in winter conditions
- Works in mountain regions
|
|
|
Some technical details
For more detailed information, see Product data sheets.
- Can be produced either in drum mixer or
by ready-mix
- Minimum cement content : 400 kg/m3
- Water/Cement ratio (W/C) ≤ 0.40
- Check admixture efficiency before use
- Vibration is recommended for placing
- Ensure proper curing
- Only converted strength must be utilized
for design purpose
.
PRODUCTION IN SUB-ZERO TEMPERATURE
AS LOW AS -10°C:
To prevent the concrete from freezing before the initial set occurs:
- Use warm or hot water
- Protect aggregates from cold
- After casting, protect concrete from freezing for 4 to 5 hours with insulating blanket or other appropriate means...
|