Rapid drying

Data sheet Ciment Fondu®


Applications

  • Road & rail repairs (traffic after 6 hours)
  • Office & retail flooring (ready to accept floor covering after 48 hours)
  • Street furniture & signs
  • Setting in security fencing, posts and gates
  • Cold weather concreting down to -10°C (protect from freezing prior to set)
  • Industrial floors

Guidelines

  • Use clean mixing equipment and drinking water
  • Never exceed 10 litres of water for 25 kg of Ciment Fondu® (water/cement<0.40)
  • In hot weather, use cold water, avoid hot materials and avoid working in direct sunlight.

Directions for use

PREPARATION
All formwork should be watertight clean and coated with mould oil. To provide a good key for bonding, the base concrete should be free of laitance and soaked with water.

MIXING
Mix cement and aggregates in the mixer or with a shovel. The ingredients are usually added in the following order : 80% of the prepared water, gravel, Ciment Fondu®, sand, balance of the water, to obtain a plastic consistency.

CASTING
For the best performance, the concrete should be compacted by rodding or vibration.

DEMOULDING
Should be done as soon as possible (normally 4-5 hours after casting for non load-bearing structures).

CURING
Due to the rapid evolution of heat during hardening, Ciment Fondu® based concrete and mortars must be kept damp immediately after setting and during the first 24 hours by regular spraying of water, use of wet sacking or a curing compound.

Ciment Fondu® concrete may be batched and delivered ready mixed.