Directions for use
PREPARATION
In order to produce dense durable concrete all formwork should be watertight, clean and coated with mould oil. To provide a good key for bonding, the base concrete should be free of laitance and pre-soaked with water.
MIXING
Order of introduction to a mixer:
90% of water(*), 1 bag Alag® Coarse, 1 bag Ciment Fondu® , 2 bags Alag® Fine, 1 bag Alag® Coarse, and the remainder of water.
WORKING TIME
The concrete should be placed as soon as possible after mixing. Working times up to 1 hour are possible but may require additional compaction.
PLACING
The concrete should be compacted by vibration or rodding.
CURING
Due to the rapid evolution of heat during hardening, Alag concretes & mortars must be cured imediately after setting has occured. E.g. spraying with water, ponding , or polythene/membrane cover.
|
(*) Use with water
reducing plasticizers
possible, consult
our Technical Dept.
|